Service Line:+86-13810682636

Company

Industrial

Notice

How to deal with the accident at the construction site of the concrete mixing plant?
With the development of engineering and construction machinery, concrete mixing plants have sprung up all over the country like mushrooms. The increase in construction sites also caused accidents. So, when an accident occurs on the site of a concrete mixing plant, how should we respond to minimize the risk?

1. For the handling of sudden crisis events, the company's emergency command center will jointly command the relevant departments and teams within the company, coordinate with the relevant external units or relevant personnel, make full use of and reflect the existing capital, and deal with the existing command institutions and personnel. , Equipment, materials, information, and working methods to ensure effective control and rapid handling of emergencies.

2. Connect the avoidance in advance and the emergency afterwards in an organic way. According to the actual needs of emergency rescue, implement all the emergency treatment work, implement the normal treatment, and improve the level of crisis prevention.

3. All departments and teams should establish corresponding departments and teams for early warning and rapid response plans and mechanisms to deal with sudden crisis events, to ensure the preparation of material and human resources, and in the event of a crisis, to ensure discovery, presentation, command, and disposal Strictly link the links and deal with them in a timely manner.
When faced with an accident, the most important thing is not to panic, but to remain calm, so that timely arrangements can be made to reduce unnecessary losses.
Home | Aboutus | Product | New | Service | Contactus | Download | Login
Copyright:Beijing SAMYON Instruments Co., LTD | Record number:京ICP备15014698号-1