There is a set of fixed operating procedures for the operation of concrete mixing station. If it is not done according to the requirements, there will be many problems, causing great harm.

1. It is easy to destroy the stability of the main engine and affect the safety of the main engine of the mixing station. The main engine has always been the core control component in the whole mixing station system. A small modification to any of its parameters may affect the production of the whole mixing station, and serious illegal operation may affect the safety of the main engine, in previous cases, the main engine system of the whole concrete mixing station was paralyzed because of illegal operation. Therefore, remind the majority of customers that the host operation is very important, and professional and technical personnel must be used to operate reasonably and regularly according to relevant procedures, in case of special circumstances, you should consult professionals in time or contact with the equipment manufacturer of the mixing station, instead of operating without permission.

2. It is easy to destroy the weighing system of the mixing station. Taking the commercial concrete mixing station as an example, it has very high requirements on the weighing accuracy of materials and moisture. If the non-professional personnel operate at will and cause the importance of materials and moisture not to meet the requirements, it is easy to appear that the weighing system is damaged due to excessive material weight and the sensor of the weighing system is damaged due to material leakage, which will further affect the mix proportion of the whole commercial concrete and eventually lead to the substandard concrete products produced later. Therefore, it is suggested that professional laboratory personnel should be employed to operate the weighing system of the concrete mixing station, and all set data should not be changed or adjusted at will.

3. It is easy to cause the failure of stirring main engine. For the mixing of materials with different properties, weights and mix proportions, the main stirring engine has obvious differences in some important parameter settings, such as mixing duration, mixing speed, etc, if the parameters of these stirring engines are changed at will, the phenomenon that the stirring shaft is damaged due to too fast stirring speed and the stirring shaft is damaged due to too long stirring time will occur. Therefore, professional technicians must be responsible for the operation of the mixing host.

4. It is easy to damage the stability of materials stored in the cement bin. For finished concrete products that have reached the standard of production, they need to be stored in bulk cement warehouses or flaky cement warehouses of different tonnage. But in the process of storage, we must pay attention to the speed of the inlet and outlet, and whether the inlet and outlet are blocked or not, and the ash cleaning operation on the top of the cement bin, etc, these all need professional staff to complete the operation. If it is operated by non-professional staff at will, it is easy to show off at the inlet and outlet, the phenomenon that the stability of stored materials in the cement bin is affected by too much damage of concrete ash on the top of the cement bin.
Safety is the key. For users, they must find a professional person or conduct pre-job training when they are equipped with concrete mixing station operators. After mastering the operating procedures skillfully, after operating skills, take up the post to prevent the occurrence of harm.